Thorough Examination of Arboricultural Lifting Equipment
Lifting Operations & Lowering Equipment Regulations 1998
The Lifting Operations and Lifting Equipment Regulations 1998 (LOLER) detail the requirement of all lifting operations to be properly planned and that all equipment used for supporting a load. it also details the requirement for all lifting equipment to be checked daily by the user (daily user checks are not required to be recorded), interim inspection (usually by the operator carried out between 1-4 weeks and has to be recorded) and a through examination carried out by a competent third party (6 monthly for PPE and accessories, 12 monthly for rigging equipment).
We can offer on site thorough examinations or alternatively you can drop your kits off with us.
We no longer provide printed copies of any documentation, so all thorough examination reports will be issued via email as a PDF.
Call or email us for prices and availability.